How plumbing runs through a new bathroom
Illustration01 / 06Drain lines are laid in the trench before the slab is poured.
Illustration02 / 06The slab is poured. Only the stub-outs stay above the floor.
Illustration03 / 06Concrete block walls go up, with a stud wall for the bathroom.
Illustration04 / 06Hot and cold supply lines start to run up through the walls.
Illustration05 / 06Rough-in complete: drain, cold, hot and shower valve, labeled.
Illustration06 / 06Finished bathroom: tile, fixtures and trim, with pipes out of sight.