Roof Replacement Day by Day: Tear-Off to Final Inspection

Rendering of a roof under construction: plywood sheathing installed over the roof trusses

Replacing a roof is a sequence of stages, each with its own checkpoint. Here is what to expect at each one. For roofing services near you, see roofing serving Doral or our main roofing page.

What happens during a roof replacement, step by step?

A roof replacement in Miami-Dade starts with an inspection and a written proposal. Then come product approvals for the chosen materials, the permit, tear-off, a dry-in inspection, installation and a final inspection. Because Miami-Dade is in the High-Velocity Hurricane Zone, materials must carry a valid Miami-Dade NOA or HVHZ-valid Florida Product Approval.

Facts at a glance
ZoneMiami-Dade and Broward are in the HVHZ (Florida Building Code)
Product approvalListed per material in the written proposal
PermitFiled with the city or county of the job address
InspectionsListed on your permit; typically include a dry-in (underlayment) and a final
TimelineDepends on weather, inspections and material lead time
Phone(786) 661-3188

What is checked at the inspection and proposal stage?

A licensed roofer walks the roof and looks at the covering, flashing, vents, roof-to-wall joints and any visible soft decking, and checks the attic for stains. The written proposal then names the roof system, the underlayment and the product approval number for each material (a Miami-Dade NOA, searchable in the county's Product Control Search, or HVHZ-valid Florida Product Approval), plus exclusions and how damaged decking will be handled. The contractor files the permit with the city or county of the address.

What happens on tear-off day?

The crew protects landscaping, pools and walkways, sets up a dumpster and removes the old covering and underlayment down to the deck. With the deck exposed, damaged or rotted sheathing is replaced and the deck is re-nailed to the code-required pattern. Your permit lists the inspections required for your job. Expect noise and debris; magnetic sweeps pick up loose nails at the end of the day.

What is the dry-in inspection?

Once the new underlayment is installed, the roof is "dried in", meaning the house is protected from rain even before the final covering goes on. A building inspector checks the underlayment and its fastening before the tile, shingle or metal is installed. Nothing goes over the underlayment until it passes.

How do installation and the final inspection work?

After the dry-in passes, the crew installs the roof covering, flashing, vents and accessories according to the product approval. When the work is complete, the building department performs the final inspection. A passed final closes the permit; keep the permit record and your proposal with your home documents.

What affects how long it takes?

Roof size and material, permit review time, inspection scheduling, rain and material lead time all play a part. Tile roofs often involve more steps than shingle or metal. Your proposal should break the job into phases; we don't promise dates before the permit and materials are confirmed.

Frequently asked questions

Can I replace only part of my roof?
Sometimes. The Florida Building Code generally limits roof repairs to 25% of a roof or roof section in 12 months, with an exception for roofs built to the 2007 code or later. A licensed roofer checks how it applies to your roof; see our post on repairing or replacing a roof.
How long will my roof take?
It depends on the size, the material, the weather and inspection scheduling. Your proposal explains the phases.
Will a new roof lower my insurance?
It may. Your insurer decides; some ask for roof age and a wind-mitigation report.
Do you work in Doral?
Yes. We serve Doral and the rest of Miami-Dade.

Internal links: roofing serving Doral (money page) · roofing · contact

Get My Free Estimate · Call (786) 661-3188 · Roofing in Doral

Office hours: Mon–Fri 8–5, Sat 9–3, Sun closed. Emergency line answered 24/7: (786) 661-3188.


Construction services are contracted and performed by Avrax Impact Windows & Doors Corp. · Lic. CGC1537852 · CCC1337133 · CFC1434609 · CPC1461209 · SCC131153459

© 2026 Avrax Developments Corp. Avrax Group is a brand of Avrax Developments Corp.