Kitchen Remodel in Miami-Dade: When You Need a Permit

Rendering of a single-story South Florida home with finished stucco and paint

Do I need a permit to remodel a kitchen in Miami-Dade?

Usually yes, if the remodel changes plumbing, electrical circuits, walls or gas lines. Purely cosmetic work such as painting or replacing a countertop in place may not need one. The building department for the address (the city, or Miami-Dade County in unincorporated areas) decides, and condo owners also need association approval first.

Facts at a glance
Permit triggersPlumbing, electrical, structural walls, gas
Usually no permitPaint, cosmetic finishes (city decides)
CondoAssociation approval before the permit
Who decidesCity or county building department of the address
EstimateFree estimate, in writing
Phone(786) 661-3188

Which kitchen changes trigger a permit?

ChangePermit likely?
Moving the sink, dishwasher or other plumbingYes (plumbing)
New circuits or relocated outletsYes (electrical, by a licensed electrical subcontractor)
Removing or opening a wallYes (building; structural review if load-bearing)
Moving or adding a gas lineYes (gas, by an appropriately licensed contractor)
Replacing cabinets and countertops in placeOften no; ask the city
Paint, hardware, backsplash tileUsually no

Each city, and Miami-Dade County for unincorporated areas, decides which work is exempt from permits and which inspections apply. Your permit lists the inspections required for your job.

Electrical work is performed under permit by licensed electrical subcontractors.

If a wall is load-bearing, drawings from a licensed engineer or architect may be required; we work with licensed architects and engineers when drawings require.

What if I live in a condo?

Get written association approval before applying for the permit. Many associations set work hours, require proof of the contractor's license and limit noisy work or elevator use. Changes to plumbing risers or shared walls usually need closer review.

What is the order of work in a kitchen remodel?

  1. Design and written proposal.
  2. Association or HOA approval, if any.
  3. Permit application and issuance.
  4. Demolition.
  5. Rough plumbing, electrical and gas, then rough inspections.
  6. Walls closed, cabinets set, countertop templating.
  7. Countertops, backsplash, fixtures and appliances.
  8. Final inspections and walk-through.

What affects the cost of a kitchen remodel?

The size of the kitchen, whether plumbing or gas moves, the number of new circuits, cabinet and countertop materials, wall changes and the permits involved. Your written proposal lists each one.

Frequently asked questions

Can I keep my kitchen layout to save time?
Keeping plumbing and gas in place often simplifies permits and scheduling.
Who pulls the permit?
Each licensed contractor pulls the permit for its own trade in its name. For example, the electrical permit is pulled by the licensed electrical subcontractor.
Can I stay in the house during the remodel?
Many owners do. Your project plan should set a temporary kitchen area.
Do you remodel kitchens in Coral Gables?
Yes. We serve Coral Gables and the rest of Miami-Dade.

Internal links: kitchen & bath remodeling · general contractor in Coral Gables · contact

Get My Free Estimate · Call (786) 661-3188

Office hours: Mon–Fri 8–5, Sat 9–3, Sun closed. Emergency line answered 24/7: (786) 661-3188.


Construction services are contracted and performed by Avrax Impact Windows & Doors Corp. · Lic. CGC1537852 · CCC1337133 · CFC1434609 · CPC1461209 · SCC131153459

© 2026 Avrax Developments Corp. Avrax Group is a brand of Avrax Developments Corp.